Southeast Asia’s oil and gas giant PTT from Thailand run their projects actively in Thailand Province “Rayong”. As PTT UT commonly build water treatment process plant along with their existing Oil and Gas plant. Electrical panels installed at site, commonly face with difficulty such as space limitation Therefore, all components installed must me space saving and yet reliable in functionality
Case Study: PTT UT
From |
Leave a reply
